1. Site Inspection for 30 kW PV solar system
2. Utility approval and permit application
3. ESA - Electrical Safety Authority pre-inspection
4. Design system and produce the electrical drawings
5. Install the racking system and the PV panels
6. Install the inverter
7. Make the necessary connections to the main panel
8. ESA - Electrical Safety Authority post-inspection
Products to be installed
- Thornova - TS-BG72 550W Bifacial Solar Panels X 68 (37.5kW)
- Fronius - Primo 15.0-1 208/240 Full 15.0 kW, 1ph X 2 (30kW)
- Tigo - TS4-A Optimizer Module (Optimization, Monitoring, Rapid ShutD) X 68
- PV Panel Racking (Various items for the racking system, including all clamps, railings and wire)