1. Site inspection to safetly remove the panels
2. Disconnect AC/DC
3. Removal of Junction boxes and Panels
4. Safely storing at customer site
5. Re-installing Panels and Junction boxes
6. Ensure all the connections completed
1. Site inspection to safetly remove the panels
2. Disconnect AC/DC
3. Removal of Junction boxes and Panels
4. Safely storing at customer site
5. Re-installing Panels and Junction boxes
6. Ensure all the connections completed